Welcome to the upgraded MacSphere! We're putting the finishing touches on it; if you notice anything amiss, email macsphere@mcmaster.ca

Feasibility Study for the Transportation of Steel Billets by Amphibious Vehicle

dc.contributor.advisorSiddall, J.N.en_US
dc.contributor.authorAntikian, John L.en_US
dc.contributor.departmentMechanical Designen_US
dc.date.accessioned2014-06-18T16:39:07Z
dc.date.available2014-06-18T16:39:07Z
dc.date.created2010-07-12en_US
dc.date.issued1975en_US
dc.description.abstract<p>The problem of transporting steel billets from the No. 3 Bloom and Billet Mill to the No. 2 Rob Mill of The Steel Company of Canada is dealt with in this report. An original solution is proposed in the form of amphibious vehicles playing a water route in Hamilton Bay between the two mills.</p> <p>The following Study will prove the feasibility of such a scheme.</p>en_US
dc.description.degreeMaster of Engineering (ME)en_US
dc.identifier.otheropendissertations/2650en_US
dc.identifier.other3550en_US
dc.identifier.other1390162en_US
dc.identifier.urihttp://hdl.handle.net/11375/7371
dc.subjectMechanical Engineeringen_US
dc.subjectMechanical Engineeringen_US
dc.titleFeasibility Study for the Transportation of Steel Billets by Amphibious Vehicleen_US
dc.typethesisen_US

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
fulltext.pdf
Size:
2.45 MB
Format:
Adobe Portable Document Format