Welcome to the upgraded MacSphere! We're putting the finishing touches on it; if you notice anything amiss, email macsphere@mcmaster.ca

The transient behaviour of transfer lines with buffer inventories

dc.contributor.authorMiltenburg, G. Johnen_US
dc.contributor.authorMcMaster University, Faculty of Businessen_US
dc.date.accessioned2014-06-17T20:41:47Z
dc.date.available2014-06-17T20:41:47Z
dc.date.created2013-12-23en_US
dc.date.issued1985-02en_US
dc.description<p>23 p. ; Bibliography: p. 23. ;</p>en_US
dc.description.abstract<p>The transfer line models in the literature are planning models rather than operational models. That is, they are very useful for planning or designing the transfer line, but are less useful for controlling daily operations of the line. The performance measure, used in these models is the expected efficiency of the line. In this paper a method is presented for calculating the variance of the efficiency of the line. These two performance measures can be used to construct a confidence interval for the expected production during a specified time interval (say, a shift) . This confidence interval is an operational guide for the production manager.</p>en_US
dc.identifier.otherdsb/108en_US
dc.identifier.other1107en_US
dc.identifier.other4944131en_US
dc.identifier.urihttp://hdl.handle.net/11375/5445
dc.relation.ispartofseriesResearch and working paper series (McMaster University, Faculty of Business)en_US
dc.relation.ispartofseriesno. 235en_US
dc.subjectBusinessen_US
dc.subjectBusinessen_US
dc.subject.lccAssembly-line methods Buffer inventories Production planning Markov processesen_US
dc.titleThe transient behaviour of transfer lines with buffer inventoriesen_US
dc.typearticleen_US

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
fulltext.pdf
Size:
889.35 KB
Format:
Adobe Portable Document Format