Welcome to the upgraded MacSphere! We're putting the finishing touches on it; if you notice anything amiss, email macsphere@mcmaster.ca

Supply chain optimization of flare-gas-to-butanol processes in Alberta

dc.contributor.authorHoseinzade, Leila
dc.contributor.authorAdams, Thomas Alan II
dc.contributor.departmentChemical Engineeringen_US
dc.date.accessioned2016-08-16T19:36:20Z
dc.date.available2016-08-16T19:36:20Z
dc.date.issued2016-08-06
dc.description.abstractn this work, the economic feasibility of combining a novel portable gas-to-methanol process with a novel methanol-to-butanol process is examined. The gas-to-methanol process converts waste flare gas into methanol using a series of truck-mounted devices deployed at oil production wellheads. The methanol-to-butanol process uses a new proprietary catalyst which produces butanol via a diketene intermediate at a large centralized facility. The goal of this work is to identify the best ways of commercializing this technology in Alberta. To do this, a supply chain optimization model is formulated which considers specifically how many gas-to-methanol trucks should be used and where specifically in Alberta they should be deployed, the specific suppliers of CO2 to use, where the location of the central methanol-to-butanol facility should be chosen, and the costs of transportation of materials between locations. The model framework also considers the possibility of getting methanol in full or in part by alternative means such as producing methanol from conventional pipeline natural gas, or purchasing methanol from petrochemical or biomass-based routes. The supply chain optimization problem is formulated as a nonconvex NLP and BARON is used in a Pareto analysis considering weighted combinations of economic and environmental objective functions. The resulting analysis provides a variety of possible viable strategies which can provide both profitability and reduced environmental emissions in Alberta by using a combination of the novel portable flare gas capture devices with more conventional gas-to-liquids technologiesen_US
dc.description.sponsorshipPioneer Energyen_US
dc.identifier.citationHoseinzade, L. and Adams, T. A. (2016), Supply chain optimization of flare-gas-to-butanol processes in Alberta. Can. J. Chem. Eng.. Accepted Author Manuscript. doi:10.1002/cjce.22616en_US
dc.identifier.other10.1002/cjce.22616
dc.identifier.urihttp://hdl.handle.net/11375/20151
dc.language.isoenen_US
dc.publisherWileyen_US
dc.subjectSupply chain optimizationen_US
dc.subjectSustainabilityen_US
dc.subjectPortable technologyen_US
dc.titleSupply chain optimization of flare-gas-to-butanol processes in Albertaen_US
dc.typePreprinten_US

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
PrePrintCompiled.pdf
Size:
1.62 MB
Format:
Adobe Portable Document Format
Description:
preprint

License bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
license.txt
Size:
1.68 KB
Format:
Item-specific license agreed upon to submission
Description: