Skip navigation
  • Home
  • Browse
    • Communities
      & Collections
    • Browse Items by:
    • Publication Date
    • Author
    • Title
    • Subject
    • Department
  • Sign on to:
    • My MacSphere
    • Receive email
      updates
    • Edit Profile


McMaster University Home Page
  1. MacSphere
  2. Open Access Dissertations and Theses Community
  3. Open Access Dissertations and Theses
Please use this identifier to cite or link to this item: http://hdl.handle.net/11375/16095
Title: Optimal Scheduling of Converter Aisle Operation in a Nickel Smelting Plant
Authors: Ewaschuk, Christopher
Advisor: Swartz, Christopher
Department: Chemical Engineering
Keywords: Scheduling;Rolling-Horizon;Continuous-time formulation;Semi-continuous;Production Planning;Nickel Smelting Converting;Mixed-Integer Linear Programming;Tiered Optimization
Publication Date: 2014
Abstract: The scheduling of the converter aisle of a nickel smelting plant is a non-trivial task with significant consequences to plant profitability and production. An optimization-based scheduling formulation is developed using a continuous-time paradigm to accurately represent event timings. The formulation accounts for environmental restrictions on sulfur dioxide emissions using event timing constraints. The formulation includes novel semi-continuous modeling to represent flash furnaces which operate with a continuous inlet flow and intermittent discrete material removal, as well as, a novel sequencing and symmetry-breaking scheme to account for identical units operating in parallel. A rolling horizon feature is included in the formulation to accommodate multi-period optimization. Tightening constraints are developed and used to improve the computational performance of the optimization and demonstrate the capacity of the proposed methodology to function as a real-time decision-support tool. A solution procedure is presented where an aggregate model is used to bound the objective function of the master problem in a two layer optimization scheme. Finally, a novel multi-tiered procedure is presented to enhance the optimization solution by re-optimizing for objectives of decreasing priority in order to minimize task start times and penalize deviations in the furnace flow rate. To address the closed-loop properties of scheduling, a reactive scheduling mechanism is included to allow for rescheduling to account the impact of process disturbances on the operating schedule. A methodology for reducing radical scheduling changes due to the optimization during reactive scheduling is presented. The reactive scheduling algorithm utilizes a tiered optimization approach that progressively increases the degrees of freedom available, as required, in order to achieve a feasible production schedule. The use of the reactive scheduling algorithm demonstrates the ability to reject disturbances and transition plant operation in an agile manner.
URI: http://hdl.handle.net/11375/16095
Appears in Collections:Open Access Dissertations and Theses

Files in This Item:
File Description SizeFormat 
Ewaschuk_Christopher_M_finalsubmission201408_MASc.pdf
Access is allowed from: 2015-09-19
Optimal Scheduling of Converter Aisle Operation in a Nickel Smelting Plant3.69 MBAdobe PDFView/Open
Show full item record Statistics


Items in MacSphere are protected by copyright, with all rights reserved, unless otherwise indicated.

Sherman Centre for Digital Scholarship     McMaster University Libraries
©2022 McMaster University, 1280 Main Street West, Hamilton, Ontario L8S 4L8 | 905-525-9140 | Contact Us | Terms of Use & Privacy Policy | Feedback

Report Accessibility Issue