Skip navigation
  • Home
  • Browse
    • Communities
      & Collections
    • Browse Items by:
    • Publication Date
    • Author
    • Title
    • Subject
    • Department
  • Sign on to:
    • My MacSphere
    • Receive email
      updates
    • Edit Profile


McMaster University Home Page
  1. MacSphere

Search


Current filters:
Start a new search
Add filters:

Use filters to refine the search results.

 | 

Results 1-10 of 12 (Search time: 0.002 seconds).
  • previous
  • 1
  • 2
  • next
Item hits:
Publication DateTitleAuthor(s)
Jun-1995Approximation methods for discrete lot streaming in flow shopsChen, Jiang; Steiner, George; McMaster University, Michael G. DeGroote School of Business
Jan-1995Lot streaming with detached setups in three-machine flow shopsChen, Jiang; Steiner, George; McMaster University, Michael G. DeGroote School of Business
Jun-1983Sequencing on single machine with general precedence constraints: the job module algorithmSteiner, George; McMaster University, Faculty of Business
Jun-1982Single machine scheduling with precedence constraints of dimension 2Steiner, George; McMaster University, Faculty of Business
Jun-1995Discrete lot streaming in three-machine flow shopsChen, Jiang; Steiner, George; McMaster University, Michael G. DeGroote School of Business
Apr-1995Discrete lot streaming in two-machine flow shopsChen, Jiang; Steiner, George; McMaster University, Michael G. DeGroote School of Business
Nov-1983On a decomposition algorithm for sequencing problems with precedence constraintsSteiner, George; McMaster University, Faculty of Business
Jun-1999A fast algorithm to minimize makespan for the two-machine flow-shop problem with release timesCheng, Jinliang; Stephenson, Paul A.; Steiner, George; McMaster University, Michael G. DeGroote School of Business
Oct-1996Subset-restricted interchange for dynamic min-max scheduling problemsSteiner, George; Stephenson, Paul A.; McMaster University, Michael G. DeGroote School of Business
Jun-1999A fast algorithm to minimize maximum lateness for the two-machine flow-shop problemCheng, Jinliang; Stephenson, Paul A.; Steiner, George; McMaster University, Michael G. DeGroote School of Business

Discover

Author
  • 7 McMaster University, Michael G. D...
  • 5 McMaster University, Faculty of B...
  • 4 Chen, Jiang
  • 3 Stephenson, Paul A.
  • 2 Cheng, Jinliang
  • 1 Drezner, Zvi
  • 1 Wesolowsky, George O.
Subject
  • 1 Lot streaming
  • 1 Permutation flow shop
  • 1 Production scheduling > Mathemati...
  • 1 Production scheduling > Mathemati...
  • 1 Production scheduling > Mathemati...
  • 1 Production scheduling > Mathemati...
  • 1 Production scheduling Production ...
  • 1 Production scheduling Production ...
  • 1 Production scheduling Sequences (...
  • 1 Release times
  • . < previous next >
Date issued
  • 7 1990 - 1999
  • 5 1982 - 1989
Sherman Centre for Digital Scholarship     McMaster University Libraries
©2022 McMaster University, 1280 Main Street West, Hamilton, Ontario L8S 4L8 | 905-525-9140 | Contact Us | Terms of Use & Privacy Policy | Feedback

Report Accessibility Issue