Skip navigation
  • Home
  • Browse
    • Communities
      & Collections
    • Browse Items by:
    • Publication Date
    • Author
    • Title
    • Subject
    • Department
  • Sign on to:
    • My MacSphere
    • Receive email
      updates
    • Edit Profile


McMaster University Home Page
  1. MacSphere

Browsing by Author Steiner, George

Jump to: 0-9 A B C D E F G H I J K L M N O P Q R S T U V W X Y Z
 
Showing results 1 to 20 of 22  next >
Publication DateTitleAuthor(s)
Jun-1995Approximation methods for discrete lot streaming in flow shopsChen, Jiang; Steiner, George; McMaster University, Michael G. DeGroote School of Business
Dec-2005Batch Scheduling in Supply ChainsSelvarajah, Esaignani
Apr-1984A decomposition approach for finding the setup number of a partial orderSteiner, George; McMaster University, Faculty of Business
Jun-1995Discrete lot streaming in three-machine flow shopsChen, Jiang; Steiner, George; McMaster University, Michael G. DeGroote School of Business
Apr-1995Discrete lot streaming in two-machine flow shopsChen, Jiang; Steiner, George; McMaster University, Michael G. DeGroote School of Business
Mar-1984Facility location with rectilinear tour distancesDrezner, Zvi; Wesolowsky, George O.; Steiner, George; McMaster University, Faculty of Business
Jun-1999A fast algorithm to minimize makespan for the two-machine flow-shop problem with release timesCheng, Jinliang; Stephenson, Paul A.; Steiner, George; McMaster University, Michael G. DeGroote School of Business
Jun-1999A fast algorithm to minimize maximum lateness for the two-machine flow-shop problemCheng, Jinliang; Stephenson, Paul A.; Steiner, George; McMaster University, Michael G. DeGroote School of Business
Oct-2013Learning effect, Time-dependent Processing Time and Bicriteria Scheduling Problems in a Supply ChainQian, Jianbo
Dec-1995Lot Streaming Schedules in Flow ShopsChen, Jiang
Jan-1995Lot streaming with detached setups in three-machine flow shopsChen, Jiang; Steiner, George; McMaster University, Michael G. DeGroote School of Business
Feb-1999New dominance orders for scheduling problemsStephenson, Paul A.
Nov-1983On a decomposition algorithm for sequencing problems with precedence constraintsSteiner, George; McMaster University, Faculty of Business
Aug-1992Optimal level schedules for mixed-model, Just-in-Time assembly systemsYeomans, Scott Julian
Jun-2004Planar maximal covering location problem under different block normsYounies, Hassan
Jun-1983Sequencing on single machine with general precedence constraints: the job module algorithmSteiner, George; McMaster University, Faculty of Business
Apr-2004Shop scheduling in manufacturing systems: Algorithms and complexityXue, Zhihui
Jun-1982Single machine scheduling with precedence constraints of dimension 2Steiner, George; McMaster University, Faculty of Business
Dec-2009Single Machine Total Weighted Tardiness With Release DatesJing, Wei
Oct-1996Subset-restricted interchange for dynamic min-max scheduling problemsSteiner, George; Stephenson, Paul A.; McMaster University, Michael G. DeGroote School of Business
Showing results 1 to 20 of 22  next >
Sherman Centre for Digital Scholarship     McMaster University Libraries
©2022 McMaster University, 1280 Main Street West, Hamilton, Ontario L8S 4L8 | 905-525-9140 | Contact Us | Terms of Use & Privacy Policy | Feedback

Report Accessibility Issue